Opening hours

Mon to Sun: 8.00AM - 8.00 PM

Fix Brothers company logo with illustrated workers holding tools.
Remodeling & Renovation

Pacific Palisades Kitchen Remodeling in Los Angeles

Licensed kitchen remodeling for Pacific Palisades homes, built with materials that hold up to marine air. We handle LADBS permits and check coastal, hillside and fire-zone rules for your lot.

★★★★★4.9 average on Google and YelpFixed project pricingInsured and workers compFree written estimatesServing LA since 2015
Pacific Palisades Kitchen Remodeling
Photo from a real Fix Brothers job in Los Angeles. Not a stock image.

Kitchens between the ocean and the canyons

Pacific Palisades sits between the coast and the Santa Monica Mountains, and houses here deal with marine air, wind and, on many lots, slope movement. The housing ranges from mid-century ranch and traditional homes on the mesas, to hillside and bluff properties with kitchens oriented to the view, to townhome and condo communities up in the Highlands that are governed by associations. Kitchen remodeling in the Palisades is partly a design exercise and partly a durability exercise. Materials and hardware that last for decades inland can look tired here much sooner.

The community is also still recovering from the January 2025 Palisades Fire. Some of the kitchen work we are asked about is in standing homes that need repair and updating. Some is part of rebuilding a home that was lost, where the kitchen belongs to a new-construction permit set. We treat both with care, and we say more below about how the permit path differs.

Two brothers started Fix Brothers in 2015 and still run it from a Chatsworth shop. The Palisades is about 40 minutes from there, so we plan full days, confirm deliveries in advance and keep tools and materials secured on site. The company is licensed and insured, and the crew that starts your kitchen is the crew that finishes it.

Building a kitchen for salt air

  • Hardware: hinges, drawer slides and pulls are chosen for corrosion resistance, particularly near doors and windows that stay open to the breeze.
  • Fasteners and exterior terminations: hood wall caps, vent covers and any exterior screws are stainless or otherwise rated for coastal exposure.
  • Cabinet construction: we favor stable plywood boxes and durable factory finishes, and we seal cut edges at the sink and dishwasher.
  • Windows and doors at the kitchen: existing frames are checked for corroded rollers, failed seals and swollen or rotted sills before new counters are set against them.
  • Lighting and plumbing fixtures: finishes are selected with the understanding that some plated finishes pit quickly near the ocean.

Slope, settling and what they do to a kitchen

On hillside and bluff lots, slow settling shows up as cracked drywall, doors that bind and floors that slope toward one corner. A new kitchen makes those problems obvious, because long countertops and tall cabinet runs are dead straight and the house is not. We check floors and walls with a laser before design is complete. Minor movement is handled by leveling the floor and scribing cabinets. If we see signs of ongoing movement or drainage trouble, we tell you plainly and recommend the right professional to evaluate it before money goes into finishes.

Permits: LADBS, the Coastal Zone, hillside and fire rules

Building permits for Pacific Palisades addresses are issued by LADBS, as the community belongs to the City of Los Angeles. Electrical, plumbing, gas and structural changes in a kitchen all require one, and we take out the permit as the licensed contractor and schedule the inspections.

Parts of the Palisades are also in the Coastal Zone, where a project can need a Coastal Development Permit or a determination that it is exempt. In our experience, a kitchen remodel confined to the interior of an existing house seldom raises a coastal issue, while work that changes the exterior or enlarges the building is more likely to. We do not assume. We verify your parcel with Los Angeles City Planning early, because a coastal review affects the start date far more than the building permit does.

Hillside lots fall under the Baseline Hillside Ordinance, and much of the area is a Very High Fire Hazard Severity Zone. For kitchens those rules apply mostly to exterior elements such as new windows, doors and vents, which have to meet the state's wildland-urban interface construction standards.

Repair and rebuild after the fire

Following the January 2025 fire, the City and the State put streamlined steps in place for rebuilding fire-damaged homes. Which steps apply depends on the lot and on how closely a rebuild follows what stood before, and the details have changed over time, so we confirm the current process with LADBS for your address instead of relying on a summary. For standing homes, kitchen repair work follows the ordinary permit path. In either case, exterior-facing components are selected to meet current fire-zone requirements.

What we confirm before quoting

  • Whether the parcel is in the Coastal Zone, a hillside area or a fire hazard zone, and what that means for this scope.
  • Floor level and wall plumb across the kitchen, plus any cracking pattern that suggests movement.
  • Condition of windows, exterior doors and sills next to the planned cabinetry.
  • Corrosion at the existing panel, gas shutoffs, supply stops and hood termination.
  • Electrical capacity and circuit count for the new appliance list.
  • Association rules for townhomes and condos, including hours and parking.
  • Street access, staging space and a delivery route for cabinets and slabs.

How the project moves

You get a site visit, then a fixed written estimate covering scope, materials, allowances, schedule and the permit path, including any coastal step. Once approved, we file permits and order cabinets and long-lead items. On site we protect the house, set up a temporary kitchen and demolish. Rough work follows: framing corrections, plumbing, gas and electrical, each inspected. We then level floors, close walls, install cabinets, template and set counters, tile, fit corrosion-resistant hardware, connect appliances and complete final inspection. We finish with a punch-list walk and hand you the permit paperwork.

Why licensing matters here in particular

A coastal, hillside, fire-zone parcel has more agencies looking at it than a typical lot, and more ways for undocumented work to cause trouble with a sale, an insurance claim or a later permit. California requires a licensed contractor for a job of this scale, and a licensed firm is the one that can pull the permit, carry the required insurance and stand behind the inspections. Check any contractor with the CSLB first. Our article on how to check a contractor's license shows the steps.

Local proof

We have no published kitchen project from Pacific Palisades at this time, and we will not borrow another neighborhood's job and relabel it. The closest kitchen we have documented is the Sherman Oaks kitchen remodel with open shelving and a professional range, which shows how we handle structure, gas, ventilation and inspections on a full remodel.

Where to read more, and how to start

Our kitchen remodeling page describes the service in full. Where the kitchen is part of a broader repair or restoration, see whole-home renovation, and for sills and frames damaged by moisture, door and window installation. For planning, read how long a kitchen remodel takes in Los Angeles.

Exterior hardware, railings and other small repairs can be grouped into a planned visit by our handyman crew, as explained on the Pacific Palisades service area page. For a kitchen, send us a request for a free written estimate and a site visit will follow.

What is included in this service

  • Parcel check for Coastal Zone, hillside and fire-zone status
  • Laser survey of floor level and wall plumb
  • Fixed written estimate showing the full permit path
  • LADBS permits, inspections and close-out paperwork
  • Corrosion-resistant hinges, slides, fasteners and vent caps
  • Plywood cabinet boxes with sealed edges at wet areas
  • Floor leveling and scribed cabinet installation
  • New plumbing, gas and electrical rough-in for the final layout
  • Counters, tile, lighting and appliance connection
  • Association submittals for Highlands townhomes and condos

Frequently asked questions

Do I need a coastal permit to remodel my kitchen in Pacific Palisades?

Often not for interior-only work, but it has to be verified for your parcel. Parts of the Palisades are in the Coastal Zone, where projects may need a Coastal Development Permit or an exemption determination. Interior kitchen remodels in existing homes seldom raise an issue, while exterior changes or added floor area are more likely to. We check with Los Angeles City Planning early and show any coastal step on your schedule.

Which materials hold up best in a kitchen near the ocean?

Corrosion-resistant ones. We specify quality stainless or coated hinges and slides, stainless exterior fasteners and vent caps, plywood cabinet boxes with sealed edges, and fixture finishes known to resist pitting. Living finishes such as unlacquered brass can work if you accept the patina. We also inspect nearby window and door hardware, since a corroded slider next to a new kitchen quickly becomes the weak point.

Is the permit process different if my home was damaged in the 2025 fire?

It can be. The City and the State created streamlined procedures for rebuilding fire-damaged homes, and eligibility depends on the lot and how the rebuild compares with the previous house. Repairs to a standing home generally follow the normal LADBS process. Because the procedures have been updated over time, we confirm the current requirements for your address directly with the agencies before giving you a schedule.

My floors slope and doors stick. Can you still install a new kitchen?

Yes, in most cases. Slow settling is common on Palisades hillside and bluff lots. We measure the floor and walls with a laser, level the floor where needed and scribe cabinetry so counters end up straight and level. If cracks or drainage problems suggest active movement, we say so and recommend an evaluation by the appropriate engineer before finish work starts, so the new kitchen is not damaged later.

How long does a kitchen remodel take in Pacific Palisades?

Most run six to eleven weeks of construction once permits are issued. Travel distance, hillside access and specialty materials add some time compared with a Valley project, and any coastal review happens before construction and follows its own timeline. We order cabinets and long-lead hardware early, stage materials at the house and give you a written calendar that separates approvals, fabrication and on-site work.

Call Us
(323) 593-3663
Address
20371 Prairie St, Chatsworth, CA 91311, United States