Remodeling & Renovation

Detached ADU Construction in Los Angeles

A new backyard unit designed to state ADU law and built on a fixed price, from foundation to final inspection.

★★★★★4.9 average on Google and YelpFixed project pricingInsured and workers compFree written estimatesServing LA since 2015
Detached ADU Construction
Photo from a real Fix Brothers job in Los Angeles. Not a stock image.

A detached ADU is a new, free-standing home in the backyard: its own foundation, walls, roof, kitchen, bathroom and front door, on the same lot as the main house. Fix Brothers designs and builds these units across Los Angeles under a single fixed-price contract that runs from the first measurement to the Certificate of Occupancy. Derek and George walk the lot themselves before anything is drawn, and the brother who priced the job stays on it through the final inspection. Below is what state law lets you build, how the utilities and foundation are handled, the order the work happens in, and the decisions that are yours at each stage.

Size, height and setbacks under state law

The California Department of Housing and Community Development's ADU Handbook, updated March 2026, spells out the minimums every local agency must honor for a new detached unit on a lot with a single-family home:

  • At least 800 square feet of interior livable space must be approved regardless of local floor-area ratio, lot coverage, open-space or front-setback rules.
  • Side and rear setbacks of no more than 4 feet may be required.
  • Height of at least 16 feet must be allowed; 18 feet within a half-mile walk of a major transit stop or high-quality transit corridor, plus 2 more feet if the roof pitch matches the main house, for a total of 20 feet.
  • Two stories cannot be refused if they fit under the applicable height limit and the building code.

Cities may allow more. In the City of Los Angeles a detached ordinance ADU may reach 1,200 square feet and two stories, subject to the lot's overall floor-area limits, and it generally has to sit behind the main house rather than between the house and the street. A local size cap can never fall below 850 square feet for a one-bedroom unit or 1,000 square feet for two or more bedrooms. Unincorporated Los Angeles County also tops out at 1,200 square feet and asks for 6 feet of separation between a detached ADU and the main structure unless a fire-rated wall is built. Minimum lot size cannot be used to deny an ADU anywhere in the state.

Utilities: what a new unit needs

Because a detached ADU is new construction rather than a conversion, the utility companies may require a new or separate connection, and any connection or capacity charge must be proportionate to the unit's size or fixture count. In practice, on a City of Los Angeles job:

  • Sewer. The Bureau of Engineering issues a sewer-availability clearance before the permit; the ADU may share the house's drainage line if the existing service meets the current plumbing code.
  • Electrical. We give the ADU its own electrical panel, as LADBS's ADU bulletin requires for converted units, and we evaluate the main service during feasibility to see whether it can carry a second panel or needs an upgrade.
  • Water and gas. The unit gets an accessible water shutoff of its own; a separate meter is optional and is your call.
  • Solar. The California Energy Code requires a solar system for a newly built detached ADU. The panels can go on the ADU roof or on the main house.
  • Power lines. If the structure is within 10 feet of a public utility easement, the Department of Water and Power must approve the encroachment.

Foundation and structure

Most detached ADUs in Los Angeles sit on a reinforced slab-on-grade with continuous perimeter footings. Footing depth and width follow the soil report: heavier clay soils call for deeper footings and more steel than sandy lots. Hillside parcels and sites in a methane zone need site-specific engineering. Even when a pre-approved standard plan is used, LADBS states that local soil conditions may require site-specific foundation design, so the foundation sheet is always checked against your lot. Framing is conventional wood, sheathed and braced for seismic loads, with exterior walls detailed for fire separation wherever they come within 5 feet of a property line.

The build sequence

  • Demolition and site clearing. If a detached garage is coming down to make room, the demolition permit is reviewed and issued together with the ADU permit, and no notice or placard is required unless the property is in a historic district.
  • Layout, excavation and underground utilities. Sewer, water and electrical conduit are trenched before the slab is poured.
  • Foundation. Forms, rebar and anchor bolts are inspected before concrete.
  • Framing and roof. Walls, roof structure, sheathing and shear panels, then the framing inspection.
  • Rough plumbing, electrical and HVAC. Inspected before anything is covered.
  • Insulation, drywall, exterior finish. Insulation is verified against the Title 24 energy report, then drywall, stucco or siding, windows and doors.
  • Interior finishes. Flooring, cabinets, countertops, tile, fixtures, paint, appliances.
  • Final inspection. LADBS issues the Certificate of Occupancy once the final passes and the other departments' clearances are closed.

Each inspection is recorded on the building card at the site, and the next phase does not start until the previous one is signed.

What you decide, and when

Before plans are drawn

Square footage and bedroom count, one story or two, where the unit sits on the lot, and whether to use a custom design or a pre-approved plan. Standard plans cut plan-check time, but they are rigid: Pasadena allows no modifications at all, and the County's three free plans must be built exactly as drawn.

Before the permit is pulled

The finish level, since cabinets, tile, fixtures and appliances are purchased at cost with receipts and the estimate assumes a specific allowance; where the solar panels go; and whether you want a separate electric meter.

During construction

Final selections on dates we give you in the schedule, so that lead times on windows, cabinets and tile never hold up a crew. Any change to the scope is priced in writing before it is built.

After completion

The Fire Department requires every separate unit to carry its own address, which can affect trash service. If you rent the unit, state law bars terms of 30 days or shorter for the state-mandated unit types.

Fee thresholds worth knowing

Local impact fees cannot be charged on an ADU with 750 square feet of interior livable space or less; above that they are proportional to the size of the main house. School district fees apply only to units larger than 500 square feet. These thresholds often decide whether a client stops at 750 square feet or goes larger, and we price both options when the lot allows.

Ready to see what your backyard can hold? Call (323) 593-3663 or request a free written estimate, and read our detached ADU permit timeline for 2026 while you wait. If a conversion of the existing garage would serve you better, see our garage conversion page or the overview of ADU and garage conversion options.

What is included in this service

  • Site visit, soil and slope assessment, utility survey and a free written estimate at a fixed price
  • Design to your program: size, bedrooms, one or two stories, placement on the lot, or adaptation of a pre-approved plan
  • Structural engineering, Title 24 energy report and solar design
  • Permit submittal through ePlanLA or the local portal, corrections and all agency clearances
  • Demolition of an existing garage or shed where required, with its permit filed alongside the ADU
  • Foundation, framing, roofing, plumbing, electrical, HVAC, insulation, drywall, stucco or siding, windows and doors
  • Kitchen and bathroom build-out with finishes purchased at cost with receipts
  • All phase inspections, final inspection, Certificate of Occupancy and a written walkthrough list

Frequently asked questions

Can I put the detached ADU in the front yard?

In the City of Los Angeles a detached ADU normally goes behind the main house, with exceptions for through lots, additions to an existing front-yard garage, and homes that already sit at the back of the lot. State law adds a backstop: a front setback cannot be used to block an 800 square foot unit if there is nowhere else on the lot to place it, and the state-mandated 800 square foot detached ADU may be located in the front setback.

How long does the permit take for a detached ADU?

The city has 15 business days to tell you the application is complete and 60 days after that to approve or deny it; a complete application that is not acted on is deemed approved. A detached unit built from a pre-approved plan must be decided within 30 days. Correction cycles reset part of that clock, which is why we answer corrections within days.

Do I need to provide a parking space?

Not for the state-mandated 800 square foot detached ADU, which carries no parking requirement at all. For a larger ordinance ADU in the City of Los Angeles one space is required unless the lot is within a half-mile walk of a bus or rail stop, within one block of a car-share location, in a historic district, or otherwise exempt. Any required space may be tandem in the driveway.

Can I use a pre-approved standard plan?

Yes. LADBS keeps a catalog of plans already checked for the building, residential, green and energy codes; you buy a copy from the plan's owner, and LADBS still reviews zoning and foundation for your parcel. Pre-approval shortens plan check but does not replace the building permit.

Can I sell the detached ADU separately from my house?

Generally no. Separate sale is possible only where a city has adopted a condominium ordinance under Government Code 66342, or in the narrow case of a unit developed by a qualified nonprofit for a low-income buyer. Otherwise the ADU stays on the same title as the main house.

Does a detached ADU need its own sewer line and electric meter?

Its own panel, yes; its own meter, only if you want one. The ADU may drain to the existing sewer lateral when that line meets the plumbing code, and the Bureau of Engineering confirms capacity before the permit issues. A separate water or power connection may be required for new construction, and any connection charge must be proportionate to the unit's size.