Fix Brothers plans, permits and builds accessory dwelling units across Los Angeles as a standalone remodeling project with its own architect, engineer and crew. Derek and George, the brothers who run the company, have been remodeling Los Angeles homes since 2015, and an ADU gets the same treatment as a whole-home renovation: one site visit, one written estimate, one fixed price agreed before anyone picks up a tool. This page covers the four unit types state law allows, how a project moves from first visit to Certificate of Occupancy, how permitting differs by city, and what drives the price.
Four ways to add a unit to a Los Angeles lot
California's ADU law (Government Code sections 66310 through 66342) requires every city and county to approve certain units without a hearing. On a single-family lot that means up to three units can be added: one converted from existing space, one junior unit inside the house, and one new detached building.
- Garage-conversion ADU. An existing garage or other accessory structure becomes a full unit with a kitchen and bathroom. State law puts no size limit on a conversion, requires no new setbacks for the existing walls, and allows an expansion of up to 150 square feet solely for an entrance or stair.
- Detached new-build ADU. A new backyard structure. Every jurisdiction must allow at least 800 square feet of interior livable space, 16 feet of height and 4-foot side and rear setbacks; the City of Los Angeles permits detached units up to 1,200 square feet and two stories under its own ordinance.
- Attached ADU. An addition that shares a wall, roof or foundation with the house, or a second story over an attached garage. In the City of Los Angeles an attached ordinance ADU is capped at 50 percent of the existing home's floor area, but never less than 850 square feet, or 1,000 square feet for more than one bedroom.
- Junior ADU (JADU). Up to 500 square feet of interior livable space carved out of the house itself, including an attached garage, with an efficiency kitchen and its own exterior door. A JADU may share a bathroom with the main house; if it does, the owner must live on the property.
Our comparison of a garage conversion versus a detached ADU walks through the trade-offs; the site visit settles it.
How an ADU project runs with Fix Brothers
1. Site visit and free written estimate
Derek or George measures the lot and existing structures, photographs the electrical panel, sewer cleanout and water service, and asks how you will use the unit. The written estimate that follows names a fixed price for that scope.
2. Feasibility
We confirm zoning on ZIMAS for City of Los Angeles parcels, check hillside, fire-severity and coastal overlays, and verify which unit types the lot can hold. Coastal Zone lots need a Coastal Development Permit as well.
3. Plans
The architect and structural engineer we work with prepare the architectural set, foundation and framing plans, and the Title 24 energy calculations, or adapt a pre-approved standard plan when one suits the lot.
4. Permit
We file through the city's portal (ePlanLA in Los Angeles), answer plan-check corrections, and collect the clearances: sewer availability from the Bureau of Engineering, hydrant and access review from the Fire Department, a zoning clearance from City Planning, and Water and Power sign-off near utility easements.
5. Build
Demolition, foundation, framing, rough trades, insulation, drywall, exterior and interior finishes follow in sequence, each phase inspected before the next begins.
6. Final inspection and Certificate of Occupancy
Nobody may live in the unit until the Certificate of Occupancy is issued after the final inspection, so we schedule it, close the permit and hand over keys, manuals and as-built drawings.
Permits: City of Los Angeles versus the cities around it
State law sets the floor everywhere: a complete application must be approved or denied within 60 days or it is deemed approved. Who runs that process depends on where the lot sits.
- City of Los Angeles. The Department of Building and Safety (LADBS) checks plans and issues the permit; City Planning applies Ordinance 186,481 and section 12.22 A.33 of the Municipal Code. LADBS also runs a Standard Plan Program of pre-approved ADU designs that shortens plan check, though zoning and foundation review stay site-specific.
- Unincorporated Los Angeles County (Altadena or Marina del Rey, for example). Regional Planning approves the ADU first through the EPIC-LA portal, then Public Works Building and Safety checks the plans. The County offers three free pre-approved plans at 800 and 1,200 square feet.
- Pasadena. ADU rules under Ordinance 7420 took effect May 20, 2024; applications go through the CSS Permit Portal, and the city's pre-approved plans may not be modified at all.
- Santa Monica. Pre-approved standard plans are allowed only for detached units, which must sit at least 6 feet from the main house and 4 feet from side and rear lines.
- Beverly Hills. Units that meet the objective standards in Article 50 of the Municipal Code skip discretionary review, but every application needs a completed ADU Affordability Questionnaire.
Our guide to ADU rules in Los Angeles has the full rundown.
Realistic timelines
The permit clock is set by state law; the construction clock is set by scope. Expect the completeness letter within 15 business days and a decision within 60 days of a complete application; a detached ADU built from a pre-approved plan must be decided within 30 days. A garage conversion builds faster than a new detached unit because the shell already exists, and two stories take longer than one. We put the construction schedule in writing with the contract rather than quoting a number here that may not fit your lot. Our 2026 permit timeline guide tracks how long each step has been taking.
What drives the cost
The written estimate itemizes the scope so you can see what moves the number:
- Conversion or new construction. A conversion reuses the foundation, walls and roof; a detached new build pays for all three plus excavation.
- Utilities. LADBS requires a separate electrical panel and an accessible water shutoff for a converted unit; whether the main panel, sewer line or water service needs upsizing is decided at feasibility.
- Size thresholds. Impact fees cannot be charged on an ADU of 750 square feet of interior livable space or less; above that they are charged in proportion to the main house. School district fees apply above 500 square feet.
- Fire separation. Walls within 5 feet of a property line on an unsprinklered unit must be one-hour rated, which adds materials and labor.
- Solar. New detached ADUs must include a solar system under the California Energy Code; conversions are exempt.
- Site conditions. Hillside lots, expansive soil and methane zones can require engineered foundations or mitigation.
- Finishes. Cabinets, tile, fixtures and appliances are bought at cost with receipts, so the finish level is yours to set.
Our article on ADU cost factors in Los Angeles goes deeper, and our pricing page explains how fixed-price quotes and change orders work on every project.
Why homeowners pick Fix Brothers for an ADU
The company is family-run, and the brother who quotes the job is the one who answers when something comes up on site. Our crews live across Los Angeles, and the office picks up seven days a week from 8am to 8pm. Change orders are priced in writing before the work happens, never afterward. Because we also do kitchens, bathrooms, room additions and second-story additions, an ADU can be sequenced with other work on the house under one contract.
Call (323) 593-3663 or book a site visit online to get a free written estimate for your ADU.
What is included in this service
- Site visit by Derek or George with measurements, photos of utilities and a free written estimate at a fixed price
- Feasibility review: zoning, overlays, setbacks, unit-type options and utility capacity for your lot
- Architectural and structural plans plus Title 24 energy calculations, or adaptation of a pre-approved standard plan
- Permit submittal, plan-check corrections and all department clearances (sewer, fire, planning, utilities)
- Demolition, site preparation and any utility trenching or panel work
- Complete construction by our own crews: foundation, framing, plumbing, electrical, HVAC, insulation, drywall, exterior and interior finishes
- Materials and finish selections purchased at cost with receipts; change orders priced in writing
- Every phase inspection through final inspection and Certificate of Occupancy, then cleanup and walkthrough
Frequently asked questions
Do I have to live on the property to rent out an ADU?
No. State law prohibits cities from imposing an owner-occupancy requirement on an ADU. The one exception is a junior ADU that shares a bathroom with the main house, where the owner must occupy either the house or the JADU. Rentals of the state-mandated unit types must run longer than 30 days, so nightly rentals are out.
How many ADUs can go on one single-family lot?
Under state law a lot with one house can hold a converted ADU, a junior ADU and a new detached ADU at the same time. The City of Los Angeles also lets you pair a detached state ADU with an attached ordinance ADU, or the reverse, when both meet their own standards. We confirm the combination for your lot during feasibility.
Can my homeowners association block an ADU?
Not outright. Covenants that prohibit or unreasonably restrict an ADU or JADU on a single-family lot are void under the Civil Code. An HOA may still apply reasonable objective standards such as materials or architectural style, but it cannot charge fees or impose conditions that make the unit impractical to build.
Do I need to add a parking space?
Often not. No parking can be required for an ADU within a half-mile walk of public transit, inside a historic district, within one block of a car-share vehicle, or when the ADU is created inside the house or an existing accessory structure. When a garage is converted or demolished for an ADU, the spaces it held do not have to be replaced.
Will building an ADU force me to add fire sprinklers to my house?
No. Sprinklers are required in the ADU only if the main house is already required to have them, and the ADU project itself cannot trigger a sprinkler requirement for the existing house.
Who handles the architect, engineer and permit paperwork?
We do. The estimate covers design, structural engineering, Title 24 calculations, the permit submittal and every clearance, and you sign as the property owner where the city requires it. You see the drawings before they are filed and approve every selection before it is ordered.