
Plenty of bathrooms in Los Angeles have a perfectly good vanity, a floor you can live with, and a shower that is failing. Grout is crumbling, the pan is cracked, the tub surround is a 1970s fiberglass insert, or there is a stain on the ceiling below. Replacing the wet area only is the single highest-value bathroom job we do, because you fix the actual failure and keep the rest of your money.
Once we open the wall we sometimes find the framing or subfloor is compromised. We photograph it, price the correction and get your approval before continuing. On roughly a third of pre-1970 homes in the Valley there is some framing repair. We would rather set that expectation now.
A straightforward pan and tile replacement starts around $4,200. A tub-to-shower conversion with new valve, niche, bench and frameless glass generally lands $7,500 to $14,000. Frameless glass alone is often $1,800 to $3,500 of that.
Almost always yes. The only real constraint is joist direction if you want a fully curbless entry.
We strongly recommend it while the wall is open. A new valve costs a few hundred dollars now and a wall repair later.
Rarely a perfect match on an older floor. We bring samples and show you the honest options, including a deliberate contrast that looks intentional instead of a near-miss.
The shower is out for the full 5 to 9 days. The toilet and sink are usually available except on demolition day.