A full bedroom renovation covering surfaces, storage and lighting. The scope included repairing and skim-coating the walls and ceiling, installing new trim, updating the lighting and switches, and refinishing the room throughout. Where a bedroom has taken years of furniture knocks and picture hooks, patching alone leaves a patchy sheen, so the walls were skimmed and primed as a whole before painting. Bedrooms are usually the last rooms in a house to get attention and the easiest to bring up to standard quickly, since there is rarely plumbing involved. Most of the work is surface preparation, carpentry and lighting, which means a single crew can complete a room without long waits between trades. We can work room by room around an occupied house, and protect flooring and remaining furniture for the duration.

Project scope

This was a full bedroom renovation covering surfaces, storage and lighting. The scope included repairing and skim-coating the walls and ceiling, installing new trim, updating the lighting and switches, and refinishing the room throughout.

Years of furniture knocks and picture hooks leave a wall that patching alone cannot hide, because spot repairs flash through the paint as a patchy sheen. For that reason the walls were skimmed and primed as a whole before painting. Flooring and the furniture that stayed in the room were protected for the duration.

How we approach a bedroom remodel

Bedrooms rarely involve plumbing, which makes them one of the quicker rooms to bring up to standard. Most of the work is surface preparation, carpentry and lighting, so a single crew can carry the room from start to finish without long gaps between trades. On jobs like this we usually work in this order:

  • Agree on the lighting plan first, since new fixtures and switch locations mean opening drywall.
  • Protect floors, seal the doorway and move or cover remaining furniture.
  • Complete electrical rough work, then close and repair the walls and ceiling.
  • Skim, sand and prime every surface as one plane, not patch by patch.
  • Install baseboard, casing and any closet or storage carpentry.
  • Paint, fit devices and fixtures, and walk the room with the owner.

What to know before a similar job

The honest answer on timing is that prep decides it. Skim coats need drying time between passes, and rushing them is how ridges end up under fresh paint. If the house is occupied, we can go room by room so nobody has to move out.

Cosmetic work such as paint, trim and skim coating does not normally need a permit. Adding circuits, recessed lights or relocating switches is electrical work and may, depending on scope and your building department's rules. Fix Brothers is a licensed and insured remodeling contractor, so that side is handled within the same job. Think about storage early too: a built-in closet system changes where outlets and lights should go.

Related services

One bedroom or several, start with a free written estimate that lists the scope room by room.

‍